Study for the Construction of Marathona - Oropo Coastal Road


A Landmark Recovery and Development Project for Northeastern Attica


The Development Organization undertakes, on behalf of the Region of Attica and with funding from the Region, the “Construction Study of the Marathon – Oropos Coastal Road”.

The construction of this road is considered a landmark project for the recovery and development of Northeastern Attica. It will serve all adjacent settlements and constitute a continuation of the coastal road network that links the northeastern coastal areas of Attica—from Skala Oropou to the settlement of Agia Marina. Along with the wider road network, it will improve access to tourist and archaeological destinations and, particularly during the summer months, accommodate the large number of holidaymakers who maintain secondary residences in the area and in the coastal settlements along the Euboean Gulf.

Within the scope of the project deliverables, the following are included:

  • Provision of services for conducting the tender process,
  • Assignment of the study,
  • Supervision, review and approval of the study and its related tender documents,
  • Preparation of traffic studies and all necessary supporting studies for the design of an interurban road connecting the Municipality of Marathon with the Municipality of Oropos in Eastern Attica.

The project is structured along the following main phases:

  • Planning and Preparation of the Public Contract File
  • Preliminary Study
  • Conceptual Design
  • Final Design – Tender Documents and Health & Safety Plan (HSP) – File for Health & Safety (FHS)

This study is part of the Action titled “Support Studies for the Region of Attica for the Specification of Development Priorities and Targeted Actions during the Programming Period 2021–2027” (Operational Programme Code: OPS 5145430).

PROJECT INFORMATION
DATE OF PUBLICATION
Jul 26, 2023
Status
Pillar
DURATION
50 months
Concessionaire
NEW METROPOLITAN ATTICA S.A.
Program
REGION OF ATTICA OWN FUNDS

0101
0101

Infrastructure works in the “Mati” Area of Eastern Attica

0202
0101

Programme Contract with the Municipality of Mykonos

0303
0101

Sediment Management in West Attica

0404
0101

Study on the Athens-Corinth Old National Road

News

Jul 20, 2023
Jul 20, 2023

The progress of the Study of the Cycling Infrastructure on Iera Odos.

The First Deliverable of the Study, funded by the Green Fund, has been completed.

News

Jul 15, 2023
Jul 15, 2023

Studies for the Parks and Groves of the Attica Region are in progress.

The Program Contract is being developed based on the schedule within the framework of Administrative Studies for the Parks and Groves of the Attica Region.

News

Jul 15, 2023
Jul 15, 2023

Results of the first phase of the Study of 18 renovations of the Municipality of Spetses

The first phase of the Study of 18 regenerations of the Municipality of Spetses has been completed and the first results according to the Program Contract.

News

Mar 17, 2023
Mar 17, 2023

In the final straight the Coastal Road Axis Oropos – Marathon  

An emblematic project for the recovery & the upgrading of Northeast Attica.